hf.co/unsloth/gpt-oss-20b-GGUF:Q4_K_M
unsloth · Q4_K_M · on ollama · quantizer build
Measured by 6 nodes on hardware we do not own, and signed by each of them. What machines here actually proved — never what the card claims.
matrix built 12 Nov 2026 · every field verified against the signature of the node that produced it, and re-verifiable by you: each signed figure carries the exact bytes the node signed (signing_payload_b64) and the signature over them, and the ed25519 public key is embedded in node_did. effective_ctx is the context length a node PROVED by recall, never the length a model card advertisesEach question was put entirely in its own language and script, and the answer had to be right. A model with no coverage cannot parse the question, so answering in English is a failure here, not a pass. 21 proved of 23 asked — a language absent from the probe set was never asked, and is not a claim either way.
How far back it remembers, machine by machine
Filled: the needle came back at that prompt size · outlined: asked and lost · blank: not asked · trained for 128K. 1 walk ended because the model forgot, 3 because the machine could not hold the prompt.
| machine · build | 4K | 8K | 16K | 32K | 64K | 128K | why it stopped |
|---|---|---|---|---|---|---|---|
| Gram ·dae679NVIDIA L4 · Q4_K_M by unsloth | 128K recalled at every size asked | ||||||
| Gram ·c76d302× Tesla T4 · Q4_K_M by unsloth | 64K the model lost the needle at 128K | ||||||
| Gram ·e61d3b2× Tesla T4 · Q4_K_M by unsloth | 4K too slow to answer here | ||||||
| Gram ·e3654fLinux, CPU only · 4 CPUs · Q4_K_M by unsloth | 4K too slow to answer here | ||||||
| Gram ·662a4eLinux, CPU only · 4 CPUs · Q4_K_M by unsloth | 4K too slow to answer here |
Carbon per million tokens
Lowest build on each machine · 2 of 5 read off a power sensor, the rest modelled from the parts · fewer grams is better
Carbon is location-based: signed energy × the yearly average of the grid where the machine signed its place (world grid average (Singapore not in the table) · EU grid average (applied to NL) · world grid average (TW not in the table) · world grid average (Australia not in the table); Ember Global Electricity Review 2025 (2024 generation), location-based). Facility overhead is not included. A machine on its own solar is not credited until it can prove it.
Tell us the workload, whose machines it should run on, and which jurisdiction it answers to.